This Saturday, 14 October, carpets will be replaced in the hallways around the Teaching Labs on the second floor.
The workers are supposed to do things one section at a time, so it should always be possible to get into and out of any of our labs. There may be equipment and supplies sitting around, though, and things may be blocked up a little from time to time. Watch your step!